
20-GP 1.2 MWh containerized energy storage system: Verify Battery, Power and Scope
Current source identity: 20-GP 1.2 MWh containerized energy storage system; released manufacturer table, BOM and project documentation are not attached.
This page defines a container-level project configuration for the 20-GP 1.2 MWh containerized energy storage system. The current record is a sourcing identity, not a released manufacturer package. Final capacity, power, battery/BMS, PCS, HVAC, fire protection, controls, installation and warranty scope must be fixed by the exact model and project BOM.
- Configuration route
- 20-GP 1.2 MWh containerized energy storage system
- Supply layer
- container-level project configuration
- Energy boundary
- Nominal value is not verified usable energy
- System boundary
- Exact BOM and project interfaces required
Current source-derived specifications
These values are preserved from the current product record. Read them with the configuration, compatibility, document and project boundaries below before using them in a quotation.
Battery & Energy
| Nominal Energy | 1.2 MWh |
|---|---|
| Battery Platform | LiFePO4; 75 × 51.2 V 314 Ah battery modules stated |
| Voltage | 672–864 V; 768 V rated battery voltage |
| Rated Capacity | 1,570 Ah |
System & Installation
| System Type | Air-cooled containerized energy storage system |
|---|---|
| Rated Power | PCS and AC block to be configured for the project |
| Cooling | Air cooling |
| Protection | Modular fire-protection system described in source material |
| Communication | CAN bus / Modbus TCP/IP |
| Dimensions | 6058 × 2438 × 2896 mm (20-GP) |
| Weight | 16 t |
| Recommended Application | Industrial parks, microgrids and utility-adjacent energy-shifting projects |
| System Efficiency | 96% |
| Depth of Discharge | 90% |
| System Charge Rate | 0.5C |
| System Discharge Rate | 0.5C to 1C |
| Operating Temperature | 0 to 50°C |
| Relative Humidity | 5% to 95% |
| Installation Altitude | <2,000 m |
| Design Lifespan | More than 15 years |
Current document status
Request exact model/suffix, electrical and thermal table, cell/BMS/PCS/EMS schedule, enclosure/safety architecture, wiring/one-line, transport/certificates, warranty and full BOM before order release.
Current configuration evidence
Keep battery, rack, cabinet and project scopes distinct
A battery component, cabinet and container system have different electrical, safety and delivery boundaries.
Exact delivered layer
The current route is container-level project configuration. Confirm whether cells, modules, rack, BMS, PCS, EMS, HVAC, fire system, transformer, switchgear and auxiliaries are included.
Energy and power
Confirm nominal and usable energy, continuous/peak DC and AC power, current, voltage window, C-rate, derating, auxiliary consumption and test basis.
Controls and safety
Confirm BMS/PCS/EMS/PPC interfaces, protocol/firmware, sensing, contactors, cooling, fire detection/suppression, alarms and fail-safe behavior.
Project and documents
Confirm enclosure/IP, foundations/civil, transport, installation, grid/utility studies, commissioning, FAT/SAT, warranty and responsibility matrix.
Storage RFQ checks
Six checks before finalizing storage scope
The final offer must define the exact equipment layer, operating duty and project interfaces.
Exact code and BOM
Request full model/revision, manufacturer, cell/module/rack or system BOM and supplied option schedule.
Energy and duty
State usable-energy target, power, duration, cycles, DoD, ambient, reserve, degradation and acceptance test conditions.
Electrical interfaces
Confirm battery voltage/current, PCS/AC voltage, protection, earthing, cable/terminal, transformer/MV where applicable and one-line.
Controls
Confirm BMS/PCS/EMS/PPC protocols, firmware, meters/CTs, remote access, cybersecurity, control permissions and commissioning.
Safety and site
Confirm thermal design, fire architecture, ventilation, enclosure, spacing, transport, civil works, emergency response and local approvals.
Evidence and commercial scope
Request test/certificate scope, manuals, warranty, spares, packing, lead time, FAT/SAT and substitution controls.
Storage boundaries
A kWh or MWh headline is not a complete storage-system guarantee
Usable energy, performance, safety and compliance depend on exact equipment, test conditions and project integration.
Nominal is not usable energy
Usable energy varies with DoD, power, temperature, ageing, reserve, BMS limits and auxiliary consumption.
Battery is not a complete ESS
A cell/module/rack route does not include PCS, EMS, HVAC, fire, AC/MV, enclosure, installation or commissioning unless explicitly listed.
Cabinet/container is not turnkey by default
Confirm every BOM layer, site/civil scope, grid interface, transformer/switchgear, transport, installation and acceptance responsibility.
Safety and approvals are site-specific
Do not infer destination fire, transport, grid or building approval from generic labels; verify exact model and project evidence.
Continue the storage review
Prepare an evidence-controlled storage RFQ
Use existing guidance to define the actual energy, power, interfaces and project delivery scope.
Storage RFQ FAQ
Questions to close before selecting a storage product
Exact model documents and project integration determine the final answer.
Is 20-GP 1.2 MWh containerized energy storage system a complete delivered system?
Not from the current sourcing record alone. Confirm the full BOM and whether battery, PCS, EMS, HVAC, fire, AC/MV, installation and commissioning are included.
Can the nominal energy be used as usable project energy?
No. Confirm DoD, power, temperature, BMS limits, ageing, reserve, auxiliaries and the test basis.
Will it pair with any inverter or PCS?
No. Confirm voltage/current, BMS protocol, firmware, contactor/protection, approved compatibility and warranty for the exact pair.
What should the RFQ request?
Request exact model/BOM, electrical and thermal tables, controls, safety architecture, one-line, test/certificates, warranty, packing, FAT/SAT and project scope.
Prepare a verified 20-GP 1.2 MWh containerized energy storage system RFQ
Send energy and power duty, site/environment, AC/DC interfaces, controls, safety, grid and document requirements to define the exact scope.
Start with the product, application or project information you have. We can help identify the remaining configuration, document or delivery questions before a final quotation.
Verify Storage ScopeRelated Products

GCB-E50 50kW / 50kWh C&I Energy Storage Cabinet
50 kW rated charge and discharge power / 50 kWh nominal system energy air-cooled commercial & industrial energy storage cabinet for small commercial self-consumption, demand management and backup projects.
View Details
GCB-E100 50kW / 100kWh C&I Energy Storage Cabinet
50 kW rated charge and discharge power / 112.53 kWh / 100.35 kWh, depending on the selected 314 Ah / 280 Ah battery option air-cooled commercial & industrial energy storage cabinet for c&i peak shaving, solar self-consumption and backup support.
View Details
GCB-E240 125kW / 241kWh C&I Energy Storage Cabinet
125 kW rated charge and discharge power / 241.15 kWh / 215.04 kWh, depending on LFP battery option air-cooled commercial & industrial energy storage cabinet for commercial peak shaving, solar-plus-storage and demand-charge management.
View Details